April 30, 2018

Cilacap Expansion 1x660MW Coal Fires Steam Power Plant (CFSPP) Marine Works Project, Subcontract on Dredging Project

January 26, 2018

Diperlukan perawatan pengerukan kolam dan alur Pelabuhan Khusus PLTU Indramayu dengan kapasitas pasokan batu bara sejumlah 4,2 juta ton per tahun.

December 28, 2017

PT Kawasan Berikat Nusantara (KBN) berencana membangun pelabuhan baru di kawasan Marunda, Jakarta Utara. Pelabuhan ini akan mendukung aktivitas lalu lintas barang dan truk untuk program short sea shipping di dalam negeri.

March 14, 2017

PT. Bina Mitra Indosejahtera has been regularly providing marine service in Belawan Port due to its high sand and clay sedimentation buildup in basin area. Now, at the increased target depth of -7 m LWS along over 1000 m long and 100 m wide dredging area, the team in C...

December 30, 2016

Package 1 civil work of Belawan Port development, North Sumatra, contained dredging and reclamation activities.

May 5, 2016

Sea transport is crucial to the alumina refinery in Galang Batang, east of Bintan island, with annual capacity of 2.1 tons. Hence, it is imperative to build an equally sizable port to handle shipment of raw material, while simultaneously engineer the channel navigation...

October 12, 2015

Engineering fishing channel within the proximity of Belawan port involves extensive work in 300.000 cubic meter of capital dredging , reaching 50 m in length, and 2600 m of spot length, all accomplished within 3 months. Clamshel Dredger GJ 701 and two units of supporti...

November 29, 2014

The annual maintenance dredging work at one of the busiest ports in Indonesia requires a total of 350,000 m3 clay-based material, with target depth at -6.5 m LWS. At 100 m wide and 850 m long, the team in Clamshel Dredger GJ 701 and the twin Split Hopper Barge Hoppers...

September 7, 2014

With a total volume of 3,000,000 cubic meter of sand, the massive work in Central Java comprises capital dredging, port basin, turning basin and channel dredging. It targeted -11 m LWS in depth, and an efficiently designed offshore and onshore dumping area. The combine...

April 22, 2014

Capital dredging in one of the most strategic ports in Jakarta required 3 months meticulous work of port basin, 75 meter wide and 500 m in spot length, consuming over 300,000 cubic meter of sand to the extent of -8.5 meter CD in depth. Reported on-site material were mo...