Marunda Center Terminal 1B Dredging Project, Marunda, Jakarta

April 22, 2014

 

Capital dredging in one of the most strategic ports in Jakarta required 3 months meticulous work of port basin, 75 meter wide and 500 m in spot length, consuming over 300,000 cubic meter of sand to the extent of -8.5 meter CD in depth. Reported on-site material were mostly silt clay. Offshore dumping area spanned across 1.8 kilometer. Our Cutter Suction Dredger is of great significance in the success of this project.

 

 

 

Please reload

Featured Posts

D.I. Gondang Irrigation Network Rehabilitation

August 1, 2017

1/5
Please reload

Recent Posts
Please reload

Archive
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2019 by think archipelago. Designed with Wix.com

QHSE
ISO 9001:2015
ISO 14001:2015
ISO 45001:2018
SMK3
Company profile
 
Download company profile