RINGKASAN PROYEK

Pengerukan pemeliharaan alur pelayaran dan kolam-kolam dermaga di Pelabuhan Belawan, dengan target kedalaman −4 hingga −10 m LWS dan jarak dumping 8–10 mil laut.

2.094.035 m³

Main volume

Dredging Locations

Navigation channel

Citra channel and basin

IKD 1–3 berth basin

Citra berth basin (201–203)

Berth basin 101–103

BICT berth basin

TPKDB berth basin

Ex-Rukindo berth basin

Belawan Lama berth basin (Warehouses 002–006)

Berth 200 basin (former Ferry Berth)

Shore Base berth basin

Equipment Deployed

3 units trailing suction hopper dredger (TSHD)

1

1 unit clamshell dredger

2

3 units hopper barge

3

Bidang usaha

Pemberi kerja

Dredging & Reclamation

Lokasi

PT Pelabuhan Indonesia I (Persero)

Periode

Belawan, Sumatera Utara

Agustus 2020 – April 2022

Documentation

Project documentation.

p28-2.jpg
p28-2.jpg
p28-2.jpg
p28-2.jpg
p28-2.jpg
p28-2.jpg
p28-2.jpg

Proyek Terkait

Other Dredging & Reclamation projects.

p28-2.jpg

Proyek Pengembangan Pelabuhan Patimban (II): Pengerukan Sementara

Patimban, Subang, Jawa Barat

September 2019 – Desember 2019

p28-2.jpg

Proyek PLTU Kaltim 2×100 MW: Pekerjaan Pengerukan

Bontang, Kalimantan Timur

Juli 2018 – Maret 2019

p28-2.jpg

PLTU 2 Jateng Adipala: Pengerukan Intake Air Laut dan Dermaga

Cilacap, Jawa Tengah

Maret 2019 – Juni 2019

Diskusikan proyek Anda bersama kami.

Sampaikan lingkup, lokasi, dan jadwal proyek Anda.

bottom of page