Cilacap Expansion 1x660MW CFSPP Marine Works Project
Cilacap Expansion 1x660MW Coal Fires Steam Power Plant (CFSPP) Marine Works Project, Subcontract on Dredging Project
Indramayu coal-powered power station port facility dredging
Diperlukan perawatan pengerukan kolam dan alur Pelabuhan Khusus PLTU Indramayu dengan kapasitas pasokan batu bara sejumlah 4,2 juta ton per
Marunda C.04 section port construction
PT Kawasan Berikat Nusantara (KBN) berencana membangun pelabuhan baru di kawasan Marunda, Jakarta Utara. Pelabuhan ini akan mendukung aktivi
Belawan Port Basin and Access Channel Maintenance Dredging
PT. Bina Mitra Indosejahtera has been regularly providing marine service in Belawan Port due to its high sand and clay sedimentation...
Development of Belawan Port - Phase 1
Package 1 civil work of Belawan Port development, North Sumatra, contained dredging and reclamation activities.
Bintan Alumina Refinery Port and Channel Navigation
Sea transport is crucial to the alumina refinery in Galang Batang, east of Bintan island, with annual capacity of 2.1 tons. Hence, it is...
Pengerukan Alur Nelayan
Engineering fishing channel within the proximity of Belawan port involves extensive work in 300.000 cubic meter of capital dredging ,...
Belawan Port Basin Maintenance Dredging
The annual maintenance dredging work at one of the busiest ports in Indonesia requires a total of 350,000 m3 clay-based material, with...
PLTU 2 Jateng Adipala Dredging Project, Cilacap, Central Java
With a total volume of 3,000,000 cubic meter of sand, the massive work in Central Java comprises capital dredging, port basin, turning...
Marunda Center Terminal 1B Dredging Project, Marunda, Jakarta