Site Clearance and Land Filling at Oleochemical Plant

January 22, 2015

Investment by PT. Energi Sejahtera, a subsidiary of Sinar Mas Group, in chemical processing facility for crude palm oil on a 24 hectares size of land in Lubuk Gaung, Dumai, absorbed 1000 construction workers and will be employing 500 people in its operation. Under tight schedule, PT. Bina Mitra Indosejahtera through its subsidiary PT. Global Jaya Maritimindo took the 24,000 m3 of land clearing, before preparing for the massive 200,000 m3 land filling.

 

The entire reclamation work of 8 hectares was achieved in 3 months due to efficient method applied in the Trailing Suction Dredgers fleet GJ 801, Sukabumi Maju, and the heavy equipments on soil work, all the while maintaining the highest standard in the environmental and safety aspects.

 

 

 

 

Please reload

Featured Posts

D.I. Gondang Irrigation Network Rehabilitation

August 1, 2017

1/5
Please reload

Recent Posts
Please reload

Archive
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2019 by think archipelago. Designed with Wix.com

QHSE
ISO 9001:2015
ISO 14001:2015
ISO 45001:2018
SMK3
Company profile
 
Download company profile