Belawan Port Basin and Access Channel Maintenance Dredging
PT. Bina Mitra Indosejahtera has been regularly providing marine service in Belawan Port due to its high sand and clay sedimentation buildup in basin area. Now, at the increased target depth of -7 m LWS along over 1000 m long and 100 m wide dredging area, the team in Clamshell Dredger GJ 701 and the pair of Split Barge Hoppers GJ 501 and GJ 502 work at higher precision to overcome the challenge. At the same time and around the same vicinity, the channel navigation dredging wo


PLTU 2 Jateng Adipala Dredging Project, Cilacap, Central Java
With a total volume of 3,000,000 cubic meter of sand, the massive work in Central Java comprises capital dredging, port basin, turning basin and channel dredging. It targeted -11 m LWS in depth, and an efficiently designed offshore and onshore dumping area. The combined equipment of Cutter Suction Dredger GJ 901 and Trailing Suction Hopper Dredger Bali II to remove on-site material—mostly made up of sand and mud—took 9 months to complete. The dredging work is significant to e