top of page

Kendari New Port Container Yard construction package 2

Pembangunan Container Yard (CY) dan Reklamasi Terminal Peti Kemas Kendari New Port (Paket 2).

  • Location: Kendari, Sulawesi Tenggara

  • Client: PT Adhi Karya (Persero), Tbk Dept. Infrastruktur II

  • Equipment: Heavy duty equipments

  • Work method: -

  • Volume: 251.071 m3

  • Work period: 25 September 2017

  • Project value: IDR43,497,995,310

  • Status: Finished


Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page