PLTU 2 Jateng Adipala Dredging Project, Cilacap, Central Java

September 7, 2014

With a total volume of 3,000,000 cubic meter of sand, the massive work in Central Java comprises capital dredging, port basin, turning basin and channel dredging. It targeted -11 m LWS in depth, and an efficiently designed offshore and onshore dumping area. The combined equipment of Cutter Suction Dredger GJ 901 and Trailing Suction Hopper Dredger Bali II to remove on-site material—mostly made up of sand and mud—took 9 months to complete.

 

The dredging work is significant to ensure the safe coal transport to the 700 megawatt power plan, one of the chief infrastructure projects in Central Java with estimated worth of IDR2.2 trillion. It is scheduled to fully operate by early 2016.

 

 

 

 

 

 

 

Please reload

Featured Posts

D.I. Gondang Irrigation Network Rehabilitation

August 1, 2017

1/5
Please reload

Recent Posts
Please reload

Archive
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2019 by think archipelago. Designed with Wix.com

QHSE
ISO 9001:2015
ISO 14001:2015
ISO 45001:2018
SMK3
Company profile
 
Download company profile