Marunda Center Terminal 1B Dredging Project, Marunda, Jakarta
Capital dredging in one of the most strategic ports in Jakarta required 3 months meticulous work of port basin, 75 meter wide and 500 m in spot length, consuming over 300,000 cubic meter of sand to the extent of -8.5 meter CD in depth. Reported on-site material were mostly silt clay. Offshore dumping area spanned across 1.8 kilometer. Our Cutter Suction Dredger is of great significance in the success of this project.